For those of you interested in the facts and figures below is a list of construction deliverables for your reference:
- Demolition and topsoil strip is complete;
- Bulk earthworks are underway with the excavation of the stormwater detention tank complete.
We look forward to bringing you more updates as Flora Edition comes to life.